3000kgs High Efficiency Cylinder Ice Maker for Drinks (TV30)
1. Product Features:
(1) Harvest ice way: Hot gas defrosts
(2) Ice tube Size: 26mm, 28mm, 30mm or 34mm in diameter; Hollow and transparent ice.
(3) Evaporator: Tube vessel, its top and bottom part was welded with quality joining.
(4) PLC program Logic Controller, which allows multiple functions such as automatic machine start and shut down; Ice falling automatically when the freezing time is ensured, Automatic water making up.
(5) Rotating Driver Ice Cutter: Stainless steel 304 Ice Cutter Blade run by medium speed gear motor.
(6) Special ice outlet. Ice discharging automatically, No need taking ice by hand which can guarantee the ice clean and sanitary, meanwhile, it is matched with ice packing system to package the ice by plastic bags.
2. Technical information
Model |
TV10 |
TV20 |
TV30 |
TV50 |
TV100 |
TV200 |
TV300 |
Capacity (tons/day) |
1 |
2 |
3 |
5 |
10 |
20 |
30 |
compressor power (kw) |
4 |
9 |
14(12) |
28 |
46(44) |
102(88) |
156(132) |
ice cutting motor (kw) |
0.37 |
0.37 |
0.55 |
0.75 |
1.1 |
2.2 |
2.2 |
circulating water pump (kw) |
0.37 |
0.37 |
0.55 |
0.75 |
1.5 |
2.2 |
2.2 |
cooling water pump (kw) |
0.75 |
1.1 |
1.5 |
2.2 |
4 |
5.5 |
7.5 |
cooling tower motor (kw) |
0.18 |
0.37 |
0.55 |
0.75 |
1.5 |
1.5 |
2.2 |
Cooling Way |
water/air cooling |
water cooling |
refrigerant |
R22/R404a/R507 |
Tube ice machine: 1680mm*950mm*2450mm;
Cooling tower: 1200mm*1200mm*1460mm.
Supply Power Form: 380V, 50Hz, 3P or 220V, 60Hz, 3P.
3. Installation:
1). Installing by the user: We will tested and install well the machine before shipment, all necessary spare parts, operation manual and CD are provided to guide the installation.
2). Installing by Koller engineers:
(1) We can send our engineer to assist the installation and provide technical support and train your workers. The end-user provide accommodation and round-trip ticket for our engineer.
(2) Before our engineer arrived in your site, the installation place, electricity, water and installation tools should be ready. Meanwhile, we will provide you a Tool List with the machine when delivery.
(3) All spare parts are provided according to our standard. During installation period, any shortage of parts due to the actual installation site, the buyer is required to afford the cost, such as water pipes.
(4) 2~ 3 workers are required to assist the installation for big project.
(5) Any delay due to customer's reason, it will be charged from the 8th day, USD100/day for one person as installation fee. Free of charge for one week.